ABR CUSTOMER LIST
The following is the ABR Consulting Group, Inc.
customer list. We are very proud of the high percentage of customers
listed below that ask us to return for additional consulting and project
work.
High
Technology
Applied Materials
Two
projects over 3 years
- On-site
planning and project management for major 3-building AMAT tool relocation
- Consulting project with large
architectural firm to produce site selection study for
two new data centers in Santa Clara, CA and
Austin, TX
California Energy Corporation
Design equipment
layout for new computer room. Produce all RFPs and drawings. Cabling design for all
premises. Manage relocation of all IT equipment
Chiron Corporation
Plan
and manage corporate data center relocation. Produce all RFPs and
drawings. Manage relocation of all data center and office IT equipment
Global Crossings/Global Centers (4 co-location data centers)
Multiple
projects over 4 years
- Consulting project to prepare
project plan for rollout of major nationwide fiber
provisioning effort. 12 cities
- Team member in the design of all
communications and network cabling for 4
co-location data centers ranging from 40,000
sq.ft. to 100,000 sq.ft.
- Team member in the design of the
MDF, & IDF facilities for these large data
centers. Specify all products
- Team member in producing all
equipment and rack layouts for all 4 data centers.
The largest data center employed the use of over
7,000 communications relay
racks. Design cabling specifications for
all
- Team member in the production of all cabling RFPs and
project drawings
- Design and specify major fiber entrance facilities (dual entrances with
8-12
conduits). Oversee fiber multiplexor installations for
4 major fiber carriers.
Multiple OC-48s, OC-12s & DS3 facilities in all
sites
- Daily on-site project management to
oversee installation of all cabling systems
Hal Computer
Two
projects over 2 years
- Inventory
and produce Visio drawings for existing computer room.
- Design equipment
layout and communications cabling plan for new
computer room
and two large technical labs. Produce power and
cooling profile for architects and
engineers.
Intel Corporation
Eleven
projects over 7 years
- Design & drawings for two large
engineering data centers. Complete cabling
design with over 6,000 connections in the most recent
project. Produced all RFPs,
drawings and migration plans (400 drawings for
first data center). Produce power
and cooling profile for architects and
engineers.
- Plan and manage both IT relocation events.
- Cabling design and RFPs for nine
large business buildings over 6 years (1.2 million
sq.ft.). On-site project management for
all cabling projects.
Loudcloud, Inc.
Design
equipment and rack layout for new computer room. Produce
power and cooling profile for architects and engineers. Produce all RFPs and drawings.
Cabling design
for computer room and all other premises (500 staff).
Nortel Networks
Four
projects over 1 year
- Design communications cabling
system for new 15,000 sq.ft. data center. Produce
all specifications and drawings.
Produce power and cooling profile for architects
and engineers.
- Re-design fiber and copper cabling
backbone to 15 other buildings caused by data
center relocating from one part of the campus to another. Inventory
all backbone
fiber connections (600+).
- Design migration and cutover plan for all campus backbone fiber
connections.
- Design fiber entrance facilities and all fiber
backbones into the data center.
Oblix, Inc.
Design
equipment layout for new server room and lab. Produce power and cooling
profile for architects and engineers. Produce all RFPs and drawings. Cabling design
for all
premises (500 staff).
Pixar Animation Studios
Design
equipment layout for large new server room. Produce power and cooling
profile for architects and engineers. Produce equipment migration
plan. Plan & manage the relocation of all IT & server equipment
Power Integration, Inc.
Design
new server room and lab. Produce power and cooling profile for architects
and engineers. Produce all RFPs and drawings. Cabling design for all
premises (200 staff).
Seagate Technologies, Inc.
Cabling design and RFPs for
ten
large business buildings over 2 years (600,000 sq.ft.). Seven projects were building re-modeling projects, three were new
buildings. On-site project management for
all cabling projects.
Visual Networks
Design
equipment layout for
new server room and lab. Produce power and cooling profile for architects and engineers. Produce all RFPs and drawings. Cabling design
for all
premises (150 staff).
Wind River Systems
Design equipment layout for new computer room. Cabling design for all
premises (500 staff). Produce power and cooling profile for architects and
engineers. Produce all specifications, RFPs and drawings. Plan and manage
relocation of all IT equipment
Worldtalk
Design equipment layouts for new server room
and lab. Produce all RFPs and drawings. Cabling design for all premises (200 staff). Plan and manage
relocation of all IT equipment
Finance
First Nationwide Bank
- Design equipment layout drawings for new main computer room and network
operating center (NOC).
- Produce power and cooling profile for architects and
engineers. Produce cabling
design and specifications for the entire 25,000 sq.ft. raised floor as well as
all office
areas (230 staff). Produce all RFPs and drawings. Produce equipment and data
circuit migration plans (intense as ATM circuits cannot go down for more than 2-3
seconds). Plan and manage relocation of all
computer room and desktop
equipment. Large IBM site
Wells Fargo Bank
Multiple projects over 6 years
- Consulting project to produce white
paper on mass storage systems
- Consulting project to produce Avaya
cabling standards RFP document to be used
nationwide by Norwest and Wells Fargo Bank
- Supply, on a contract basis,
relocation project managers for multiple office
relocations
- Supply on a contract basis, Y2K
programmers
- Supply on a contract basis, a
senior project manager for major bank business
installations
General
Business
Adecco
Equipment
inventory and drawings for data center. Maintain drawings for two
years
The Good Guys
Design of communications cabling system for
3-story corporate headquarters. Produce all RFPs and drawings
U.S. Leasing
Design
communications cabling system for 7-story building. Produce all RFPs
and drawings. Oversee and manage cable installation
Williams-Sonoma, Inc.
Four
projects over 5 years
- Design communications cabling
system for new call center in Las Vegas, NV.
Design equipment layout for server
room.
- Design communications cabling
system for new call center in Oklahoma City, OK.
Design equipment layout for server
room.
- Design
equipment layout for new computer room in Memphis, TN. Produce power
and cooling profile for architects and
engineers. Produce communications cabling
design and specifications.
Produce all RFPs and drawings for
project
Government
City of Berkeley,
California
Two
projects over 1 year
- Cabling
design for the new Public Safety Center
- Strategic PBX and voice plan for City
City and County of San
Francisco, California
Four
projects over 7 years
- Design new main computer
room. Produce all RFPs and over 100 drawings.
Cabling design for all premises. Manage relocation of all
computer room and
desktop equipment. Large IBM site.
- Design Hall of Justice data center
retrofit (room was re-modeled with equipment
operating in the room). Major 911 CAD system site. Major inventory of cables
coming into
room. Cabling design for re-model. Plan and manage relocation of all
equipment within room.
- Design communications cabling
design for new City and County 7-story court
building.
- Produce plan for relocation of all
IT equipment in San Francisco's City Hall as part
of complete 3-year re-model project.
Cabling design for 4 buildings where staff was
to be relocated. Produce
all equipment migration plans, RFPs and
drawings.
Manage all IT relocation events (1,600 staff, 2,200 pieces of equipment).
City of Sacramento,
California
- Cabling
design for re-model of 4 buildings for the Regional Transportation District
County of Humboldt,
California
- Cabling
design for new county jail facility
County of Sacramento,
California
Seven projects over 7 years
- Design new main computer
room. Cabling design for computer room and 7-story
building. Produce
the power and cooling
profile for architects and engineers.
Produce equipment and data
circuit migration plans. Manage relocation of all IT
equipment.
Large IBM site
- Design communications cabling
design for new County Coroner/Crime Lab.
- Design communications cabling
system for re-model of County's international
airport's rental car area.
- Design communications cabling
system for re-model of the County's wastewater
treatment plant
- Design communications cabling
system for 3 re-model projects
- Produce strategic plan for
long-term expansion of the County's Wide Area Network.
County of Santa Clara, California
Two
projects over 4 years
- Consulting project to identify and
recommend site for new data center
- Design new main computer
room. Cabling design for computer room and 3-story
building. Produce the power and cooling
profile for architects and engineers.
Produce equipment and data
circuit migration plans. Manage relocation of all IT
equipment.
Large IBM site
State of California (combined CHP/Caltrans data center)
Design equipment and rack
layout for new computer and telecommunications room. Cabling design for all
premises. Major State 911
and microwave site
State of California (4 Dept of Justice crime labs)
Design
the communications cabling system for four new Department of Justice Crime Labs
throughout the State of California. Produce all specifications,
RFPs and drawings
Contact us at www.abrconsulting.com